Before Installation

The following preparations are needed prior to installation of ToolsNet 8:

  • Make sure that the computers that are to run ToolsNet 8 comply with the hardware and software requirements.

  • Make sure that the system firewall is OFF, or open the ports.

  • Make sure that Atlas Copco Data Communication is installed.

  • For Atlas Copco Data Communication ports, see Reference Documents.

If ToolsNet 4000 is installed on the server, perform an upgrade.

Port No

Protocol

Firewall

Collection

Description

Conf.able

6594

TCP

Internal/External

ACTLicenseServer.exe

Used by License client application for TCP communication with the New License Server

No

6594

TCP

Internal/External

ACTLicenseServer.exe

Used by ADC for TCP communication with the New License Server

No

6595

TCP

Internal/External

ACTLicenseServer.exe

Used by Open Protocol controllers or system components for TCP communication with the New License Server

No

7102

Notification Service

WebAPI port used by ToolsNet web

No

7101

Archive Service

WebAPI port used by ToolsNet web

No

9993

TCP

Internal

PMProgramManagerProxy

Used to see PowerMacs program details.

No

When considering Firewall:

  • Internal: Must be opened for internal network traffic.

  • External: Must be opened for contact with Atlas Copco license server.

Read the sections about server configuration for the intended server use. Always make sure that your database server is installed, set up properly, and running.

Hard drives and data files

Contact the database administrator to determine the following settings.

  1. Check that there is enough free hard drive space for Production data.

  2. Decide which hard drive volume and folder should be used for Production data.

These values are not set at this stage.

The SQL Server transaction log file grows when delete maintenance is running. This log file is truncated when the database is backed up. The DBA needs to have a strategy for keeping a reasonable log file size.