VDI/VDE 2645-2
Below are the items of the VDI/VDE 2645-2 inspection result details card:
Inspection: name of the inspection.
Route: name of the route that contains the inspection.
Result date: date of the inspection.
Measuring device: measuring device used to do the inspection.
Operator: name of the operator that did the inspection. It is shown if the measuring device manages the users.
Target object: name of the joint under control.
Status: below are the available options, depending on the status of the inspection:
Partial: the inspection is closed before the batch is completed. The test can be completed later.
Completed: the inspection execution is closed after the batch is completed.
Abandoned: the inspection execution is not completed but it is manually closed. The test cannot be completed later.
Results status: below are the available options, depending on the result status of the inspection:
OK: all the results are OK.
NOK: at least one result is NOK.
Test point table
Test point: name of the test point.
Status: result status of the single test point.
Traceability: in this table the traceability tags configured in the route linked to the inspection are shown. In particular, the name, the level and the values of each configured traceability tag are displayed.