JJF 1610:2017
Below are the items of the JJF 1610:2017 inspection result details card:
Inspection: name of the inspection.
Route: name of the route linked to the inspection.
Result date: date of the inspection.
Measuring device: measuring device used to do the inspection.
Target object: name of the tool inspected.
Status: below are the available options, depending on the status of the inspection:
Partial: the inspection is closed before the batch is completed. The test can be completed later on.
Completed: the inspection execution is closed after the batch is completed.
Abandoned: the inspection execution is not completed but it is manually closed. The test cannot be completed later on.
Calibration points table: the test point table displays the following data:
Calibration points: the calibration points column shows the preload phase and the results of each calibration point of high torque and low torque rate reading.
U [%]: the expanded uncertainty column shows the expanded uncertainty percentage of each calibration point of high torque and low torque rate reading.
Statistics: below are the statistics of the execution:
k: coverage factor applied to the relative measurement uncertainty.
Notes: comment written on STbench/STpad during the test.