Pump Installation
Main Power Supply Requirement
The pump has a three phase motor with a 16A, 3P+N+E electrical socket.
For the power supply requirements, refer to the table.
Operating frequency | Voltage | Voltage tolerance | Resultant motor power |
---|---|---|---|
50 Hz | 400 V | ±10% | 1.5 kW |
60 Hz | 440 V | ±10% | 1.8 kW |
Electrical Connections
Before connecting the equipment, check the cables for damage.
The cables must be free from erosions and scrapings.
All the connections must be carried out with elements standardized for this purpose and marked with their electrical characteristics. These electrical characteristics must agree with the characteristics of the power supply and the pressure equipment.
Check that the voltage indicated on the pump ID plate matches the power lead voltage.
If it is necessary to replace the power cable, make sure to assemble it carefully. Before assembling the power cables, put back its insulating sheath and adjust the relevant screws.
Any improper or unauthorized handling of the control box and its internal components can lead to the loss of the warranty and the manufacturer’s responsibility. For this reason it is recommended to send the equipment to the distributer or to contact Atlas Copco Service centers.
Hydraulic Installation
Disconnect the pump from the main power supply.
Fill the oil tank with the suitable grade oil for ambient temperature.
To avoid the oil spillage always use the funnel for oil filling.
Close the oil filling tube with the orange cap.
Check the minimum and maximum oil marking level.