Cp/Cpk (joint/dimensional)

Below are the items of the Cp/Cpk (joint/dimensional) inspection results details card:

  • Inspection: name of the inspection.

  • Route: name of the route linked to the inspection.

  • Result date: date of the inspection.

  • Measuring device: measuring device used to do the inspection.

  • Target object: name of the joint under control.

    This item is displayed only for the Cp/Cpk Joint check.

  • Operator: name of the operator that performed the inspection. It is shown if the measuring device manages the users.

  • Status: below are the available options, depending on the status of the inspection:

    • Partial: the inspection is closed before the batch is completed. The test can be completed later.

    • Completed: the inspection execution is closed after the batch is completed.

    • Abandoned: the inspection execution is not completed but it is manually closed. The test can not be completed later.

  • Results status: below are the available options, depending on the result status of the inspection:

    • OK: all the results are OK.

    • NOK: at least one result is NOK.

Control Chart

  • Torque/angle/dimension: the graphs shows the physical characteristics values measured during the test.

    In the graphs, the lines indicate:

    • Minimum and maximum values (red lines)

    • Nominal value (green line)

    Click on the chart to open a full screen.

Statistics

  • Torque/physical quantity: below are the statistics of torque, angle, torque and angle or physical quantity:

    • Minimum Cp and Cpk

    • Actual Cp and Cpk

    • Average value

    • σ: standard deviation

    • Average values +/- 3σ

  • Traceability: in this table the traceability tags configured in the route linked to the inspection are shown. In particular, the name, the level and the values of each configured traceability tag are displayed.