ISO 6789:2003
Below are the items of the ISO 6789:2003 inspection result details card:
Inspection: name of the inspection.
Route: name of the route linked to the inspection.
Result date: date of the inspection.
Measuring device: measuring device used to do the inspection.
Target object: name of the tool under control.
Operator: Name of the operator that did the inspection.
It is shown if the measuring device manages the users.
Status: below are the available options, depending on the status of the inspection:
Partial: the inspection is closed before the batch is completed. The test can be completed later on.
Completed: the inspection execution is closed after the batch is completed.
Abandoned: the inspection execution is not completed but it is manually closed. The test cannot be completed later on.
Result status: below are the results of the execution:
OK: all the results are OK.
NOK: at least one result is NOK.
N/A: at least one test point is not executed.
Test point: for each test point, in the graph are displayed:
Percentage of the maximum torque of the tool.
Value of the test torque.
Result of the test point: OK, NOK, N/A.
Torque deviation chart.
Traceability: in this table the traceability tags configured in the route linked to the inspection are shown. In particular, the name, the level and the values of each configured traceability tag are displayed.