Vertical installation front mounting
Press | Front mounted |
---|---|
PST 5 | M8 (4x) |
PST10 | M8 (4x) |
PST20 | M8 (8x) |
PST35 | M10 (8x) |
PST50 | M10 (8x) |
PST60 | M10 (8x) |
PST100 | M12 (8x) |
Required tools
Allen keys or bits 4-10 mm
Screw bits and sockets
Torx® keys or bits T6-T25
Torque wrench
Lifting device
Screwdrivers
Pliers
Bearing puller (optional)
Feeler gauge
Assembly
Fit a lifting eye in the rear end of the press, see dimensional drawings in ServAid.
Unscrew the screws in the front end of the press.
Lift the press to a vertical position.
Assemble the press to the mounting plate using new longer screws.
See dimensional drawings in ServAid for the screw length.