Operating instructions

 

  1. ALWAYS check the general state of the equipment before connecting it to the main, to detect possible damages, both in the unit and in the hydraulic circuit.

  2. Verify that the hydraulic circuit is properly closed and that the tightening devices are correctly placed on the bolts to be tightened. Check that the personnel involved in the tightening process is alert and has the tools and the adequate personal protective equipment.

  3. Connect the equipment to the main supply. Note that when using an autonomous generator unit, it should provide a minimum of 16 KVA power. Refer to the section MAIN SUPPLY REQUIREMENTS for details. Ensure that the emergency stop switch is released.

Select automatic or manual mode by pressing the grey button.