Assigning a Fieldbus Map to a Virtual Station
Assigning a fieldbus map to a virtual station and placing it into the Process Data Frame:
Select a controller in the Plant structure workspace .
Select the Fieldbus and SoftPLC tab then select theOverview sub-tab.
Select Add in the Fieldbus Virtual Station Mapping Configuration menu.
The Add fieldbus mapping dialog window opens.
Select a Virtual station.
Select a Fieldbus configuration.
Select Add, the dialog window closes and the configuration is added.
Repeat steps 3-6 as many times as needed.
Fieldbus maps are placed into the Process Data Frame in the order that they are assigned to a virtual station, or at the lowest possible entry point where the Fieldbus map can fit.