Liability
Many events in the operating environment may affect the tightening process and shall require a validation of results. In compliance with applicable standards and/or regulations, we hereby require you to check the installed torque and rotational direction after any event that can influence the tightening result. Examples of such events include but are not limited to:
- initial installation of the tooling system 
- change of part batch, bolt, screw batch, tool, software, configuration or environment 
- change of air- or electrical connections 
- change in line ergonomics, process, quality procedures or practices 
- changing of operator 
- any other change that influences the result of the tightening process 
The check should:
- Ensure that the joint conditions have not changed due to events of influence. 
- Be done after initial installation, maintenance or repair of the equipment. 
- Occur at least once per shift or at another suitable frequency.