Actions
Action running a repair
A tool that runs a repair will run the steps in its repair path and jump back to a previous synchronization point. The repair is ongoing until the program returns to the synchronization point that started the repair. When the repair are done the status of the tools, repair groups and the total status will be evaluated again. If the total status is now OK all tools will continue with the next step, otherwise a new repair or termination is started.
The tools not running a repair will stay at the current synchronization point and wait for the repair to finish.
Action on Status | Total status NOK |
|---|---|
Repair NOK | All the tools with status NOK will run a repair. The tools not running a repair will stay at the current synchronization point and wait for the repair to finish. |
Repair NOK groups | All tools that belong to a repair group with status NOK will run a repair. All the tools in the repair group will run a repair, regardless of their individual status. The tools not running a repair will stay at the current synchronization point and wait for the repair to finish. |
Repair All | All the tools, regardless of their status, will run a repair. |
Action running a termination
A tool that runs a termination will run the steps in its termination path. After that, the tightening is completed with status NOK.
Action on Status | Total status NOK | Total status Not repairable |
|---|---|---|
Terminate NOK | All the tools with status NOK will run a termination. | All the tools with status NOK or Not repairable will run a termination. |
Terminate NOK Groups | All tools that belong to a repair group with status NOK will run a termination. All the tools in the repair group will run a termination, regardless of their individual status. | All tools that belong to a repair group with status NOK or Not repairable will run a termination. All the tools in the repair group will run a termination, regardless of their individual status. |
Terminate All | All the tools, regardless of their status, will run a termination. | |
The tools with status OK will continue according the setting Other :
Continue: The other tools will wait on the current synchronization point until the termination is finished. After this they will continue with the remaining parts of the tightening program.
End all: The other tools will end the tightening.
Action end a tightening program
A tool that end the tightening program will go directly to the end without running any other steps. After that the tightening is completed with status NOK.
Action on Status | Total status NOK | Total status Not repairable |
|---|---|---|
End NOK | All the tools with status NOK will end the tightening without running the termination path. | All the tools with status NOK or Not repairable will end the tightening without running the termination path. |
End NOK Groups | All tools that belong to a repair group with status NOK will end the tightening without running the termination path. All the tools in the repair group will end the tightening, regardless of their individual status. | All tools that belong to a repair group with status NOK or Not repairable will end the tightening without running the termination path. All the tools in the repair group will end the tightening, regardless of their individual status.. |
End All | All the tools, regardless of their status, will end the tightening without running the termination path. | |
The tools with status OK will continue according the setting Other :
Continue: The other tools will continue with the remaining parts of the tightening program.
Terminate all: The other tools will run a termination.
Action on total status Fatal
If the total status is Fatal a repair is not allowed. The tools with status Fatal cannot run anymore, so they will just end the tightening. The other tools will terminate, regardless of their individual status.
If one of the bolts is NOK but has no repair action configured in the tightening program, the mode will end all. NOK will state the main NOK cause for that bolt.
If one of the bolts is NOK and has a repair path, the system tries to repair until the maximum time limit is reached on the NOK bolt. The other bolts, which are OK, will wait. If the bolt gets OK after n number of repairs, the program continues as in the first bullet above with all the bolts. If the bolt still does not get OK, the whole sync mode will end as in bullet two.