Results
The Results page lists the results of the inspections that have been run.
On the sidebar menu, select Results
.
Below are the columns that define the list of results:
Inspection: name of the performed inspection.
Inspected object: name of the inspected object.
Date: date and time when the inspection has been run.
Status: status of the inspection. Depending on the selected inspection, the status can be one of the following options:
Partial: the number of samples is not completed or is equal to 0.
Completed: all required samples have been acquired.
Abandoned: the inspection/joint has been deleted or the parameters that reset the statistics have changed.
Result: the result of the inspection can be:
OK.
NOK.
Empty field: the inspection status is either partial or abandoned.
If the inspection type is SPC, no result is displayed until the ongoing subgroup is completed.